The problem with a purely financial accounting is it ignores environmental and social costs entirely.
Here's a quote about a data centre currently being built near Edmonton, Alberta.
------
"Utah State University physicist Robert Davies was hired by SLCN to conduct a preliminary technical assessment. He said if the Wonder Valley project goes ahead it would release the equivalent of 23 atomic bombs of energy every day, though he noted the comparison has its limits."
Source: https://www.cbc.ca/news/canada/edmonton/wonder-valley-slcn-c...
------
This is not the total energy being consumed by this data centre. It's merely the waste heat it will release to the surrounding environment.
Here's the energy consumption:
------
"At full operation, it would consume energy at a continuous rate of 18 gigawatts or about 1.5 petajoules per day and emit about 30 million tonnes of carbon dioxide a year – more than four per cent of Canada’s total emissions, said Davies, whose assessment was based on publicly available information."
------
That's the equivalent of 1.66 million Canadians in carbon emissions, or 1.6 Edmontons. This is just one data centre. Many more are going up across Canada, and Canada is both late and slow to the buildout.
That's the kind of scale we're dealing with at a time when, as a world, we are trying to reduce our carbon emissions.
Everyone wants to make quick buck with AI powered solutions. The real problems like climate change will remain on back burner with this AI frenzy. There's no reward to solve climate change in short term unlike math problems.
We are going to accelerate climate change with AI.
As long as we are going to keep pumping every drop of tight oil out of the ground its going to make sense to generate power (or intentional useful heat) from the natural gas that comes with it rather than just flare it at the extraction site.
Data centers use what comes in on a transmission line or what they can build themselves. When they take from a transmission line it's not their choice how the energy was generated- its our choice.
When a data center builds its own power plant natural gas is the only option. Nuclear has been regulated into impossibility although there is an effort to change this with small module nuclear reactors. A solar farm would need massive amounts of land to keep up with a data center in winter (and massive amounts of batteries to keep it running at night).
- French Nuclear (where Mistral is) is around 5 gCO2/kwh
- Gas plants (where all US models are) are around 300-350 gCO2/kwh
- Coal plants (where most Chinese models are) are around 800-900 gCO2/kwh
So in term of consumption, your queries are around 65x greener in term of energy consumption hitting a French datacenter than a US one.
Why US data providers are not building more Nuclear power ?
Answer: Time to market. It takes less than a year to setup a 1GW gas turbine. And close to 10y to setup a similar capacity in Nuclear.
Why France does not have the problem ?
Answer: Because they do have a ridiculous oversized Nuclear park with 150 TWH of overcapacity per year.
The only other areas of the world that can afford to have both the grid power necessary for A.I datacenters and the low Carbon intensity are: Sweden, Norway and Canada hydro (in some areas).
Hope for solar datacenters in the Middle East?
At least from the news I've seen across the ocean, I was under the impression that the USA's grid was already stretched way too thin because of their lack of investment in renewables, and many people are against data centers because electricity is already too expensive for normal people. Or was that just news cycle hyperbole?
That doesn't mean much if they build in places with loose regulations.
The US brags a lot about its tech dominance, but if you isolate the continent away from global supply chain, it's game over